Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Alkaissy, M, Arashpour, M, Zeynalian, M and Li, H (2022) Worksite Accident Impacts on Construction and Infrastructure: Nondeterministic Analysis of Subsectors and Organization Sizes. Journal of Construction Engineering and Management, 148(06).

Aroke, O, Hasanzadeh, S, Esmaeili, B, Dodd, M D and Brock, R (2022) Using Worker Characteristics, Personality, and Attentional Distribution to Predict Hazard Identification Performance: A Moderated Mediation Analysis. Journal of Construction Engineering and Management, 148(06).

Candaş, A B and Tokdemir, O B (2022) Automating Coordination Efforts for Reviewing Construction Contracts with Multilabel Text Classification. Journal of Construction Engineering and Management, 148(06).

Chen, G, Chen, J, Tang, Y, Li, Q and Luo, X (2022) Identifying Effective Collaborative Behaviors in Building Information Modeling–Enabled Construction Projects. Journal of Construction Engineering and Management, 148(06).

Dou, Y and Bo, Q (2022) Characteristics and Dynamics of BIM Adoption in China: Social Network Analysis. Journal of Construction Engineering and Management, 148(06).

Hussein, M, Darko, A, Eltoukhy, A E E and Zayed, T (2022) Sustainable Logistics Planning in Modular Integrated Construction Using Multimethod Simulation and Taguchi Approach. Journal of Construction Engineering and Management, 148(06).

Jiang, S, Ma, G, Jia, J, Wu, M and Wu, Z (2022) Mobile ICT Overuse in the Construction Industry: Effects on Job Burnout of Project Managers. Journal of Construction Engineering and Management, 148(06).

Liu, G, Huang, R, Li, K, Shrestha, A and Fu, X (2022) Greenhouse Gas Emissions Management in Prefabrication and Modular Construction Based on Earned Value Management. Journal of Construction Engineering and Management, 148(06).

Liu, K and El-Gohary, N (2022) Bridge Deterioration Knowledge Ontology for Supporting Bridge Document Analytics. Journal of Construction Engineering and Management, 148(06).

Liu, T, Chong, H, Zhang, W, Lee, C and Tang, X (2022) Effects of Contractual and Relational Governances on BIM Collaboration and Implementation for Project Performance Improvement. Journal of Construction Engineering and Management, 148(06).

  • Type: Journal Article
  • Keywords: Building information modeling (BIM) collaboration and implementation; Contractual governance; Relational governance; Project performance; Partial least-squares structural equation modeling;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002285
  • Abstract:
    Both contractual and relational governances affect building information modeling (BIM) collaboration and implementation (BCI) to improve project performance. However, the mechanism by which these governances and their interaction influence BCI remains undetermined. Considering transaction cost economics and social exchange theories, this study aimed to investigate the extent of the effect of contractual and relational governances and their interactions on improving BCI. We developed a series of hypotheses and a questionnaire to achieve the aims of the study. The partial least-squares structural equation modeling was applied to analyze the cause–effect relationship arising from the hypotheses. The results show contractual and relational governances affect BCI positively. Contractual governance, which consists of monitoring elements in safeguarding provisions, positively affect BCI and project performance. However, there is no effect found for safeguarding provisions that define the rights of parties in the contract. The study also reveals that contractual governance does not influence relational governance in BCI. This research provides new insights to project managers on the use of effective governance mechanisms to deliver BIM-enabled megaprojects for improving project performance.

Lv, L, Wang, Z, Li, H, Zhang, C and Qiao, R (2022) Tournament Incentive Mechanisms Design for Long-Distance Water Diversion Projects Incorporating Preference Heterogeneity. Journal of Construction Engineering and Management, 148(06).

Shen, K, Li, X, Cao, X and Zhang, Z (2022) Prefabricated Construction Process Optimization Based on Rework Risk. Journal of Construction Engineering and Management, 148(06).

Wang, S, Ni, Z, Qu, T, Wang, H and Pan, Q (2022) A Novel Index to Evaluate the Workability of Conditioned Coarse-Grained Soil for EPB Shield Tunnelling. Journal of Construction Engineering and Management, 148(06).

Yang, Y, Pan, M and Pan, W (2022) Integrated Offsite Logistics Scheduling Approach for High-Rise Modular Building Projects. Journal of Construction Engineering and Management, 148(06).

Zhan, W, Pan, W and Hao, G (2022) Productivity Measurement and Improvement for Public Construction Projects. Journal of Construction Engineering and Management, 148(06).

Zhong, S and Elzarka, H (2022) A Hybrid Grey System Theory–Based Subcontractor Selection Model for High-Stakes Construction Projects. Journal of Construction Engineering and Management, 148(06).